2019 Asphalt Project, Location #1

6th Street between 4th Avenue and Railroad Avenue will be resurfaced with asphalt as part of Moline’s 2019 asphalt project. This is location #1 of 2.

The project will include asphalt removal and replacement. Other work will include pavement patching, curb repairs, sidewalk improvements, driveway repairs, drainage improvements, and other related work.

This project is funded through local funds, including tax funds for electric and gas usage.

This location was chosen because the existing pavement base is in adequate condition, meaning it doesn’t need reconstructed, however the pavement surface needs replaced.

Timeline: Summer / Fall 2019

Contractor: Walter D. Laud, Inc.

Capital Improvement Project: #1313

Funds:

•    Tax on Electric Gas and Usage $85,000

Contacts: Darrel Preston, Construction Manager

                 (309) 524-2355

                 dpreston@moline.il.us

                 Joe Puck, Engineering Technician II

                 (309) 524-2361

                 jpuck@moline.il.us