2021 Alley Reconstruction #2

The City will be reconstructing 2 residential alleys in the summer of 2021.  The first is an east-west alley ½ block south of 19th Avenue, from 6th to 7th Street.  The second is an east-west alley from 25th to 26th Street / 6th to 7th Avenue.

These projects will include pavement replacement with a rock base and concrete pavement, driveway repairs, and other associated work.

These projects are being funded with local funds, and sites were chosen due to deteriorating pavement conditions.

Timeline:   Summer 2021

Contractor:  Emery Construction Group Inc. 

Capital Improvement Project:  1347

Funds:

  • Local:  $150,000


Contact:  Darrel Preston, Construction Manager

(309) 524-2355