Sanitary Crossing at John Deere Road

This project is to install a new sanitary sewer pipe inside of a casing pipe that was installed during the John Deere Road Reconstruction in 2016.  This sanitary sewer crossing is critical, as it carries a significant amount of flow to the South Slope Wastewater Treatment plant.

Timeline:   Summer 2021

Contractor:  TBD

Capital Improvement Project:  1346

Funds:

  • Sanitary Sewer:  $150,000


Contact:  Darrel Preston, Construction Manager

(309) 524-2355