The 33rd Avenue reconstruction project will take place on 33rd Avenue, east of 41st Street to the double cul-de-sac.

The project will include pavement replacement with a rock base and asphalt driving surface, new curb and gutters, sidewalk repairs, driveway repairs, water main replacement including services, sanitary sewer replacement including services, storm sewer improvements, and other associated work.

This project is funded through local funds, including tax funds for electric and gas usage.

This project was chosen due to the need to replace the discolored water mains.

Timeline: Summer / Fall 2019

Contractor: Legacy Corporation of IL

Capital Improvement Project: #1311

Funds:

•    Tax on Electric Gas and Usage $380,000

•    Water $210,000

•    Sanitary Sewer $95,000

•    Stormwater $5,000

Contacts: Darrel Preston, Construction Manager

                (309) 524-2355

                dpreston@moline.il.us

               Scott Green, Resident Construction Inspector

               (309) 524-2356

               sgreen@moline.il.us