Lift Station Replacement, Airport #3

The sanitary lift station located south of the Airport along 75th Avenue will be replaced. The existing station is deteriorated and in need of replacement. The new station will be able to handle the additional wasted anticipated with future development.

This project is funded through local utility funds.

Timeline:  Fall 2019

Contractor: Langman Construction, Inc. 

Capital Improvement Project: #1298

Funds: 

  • WPC Funds $100,000

Contacts:  Darrel Preston, Construction Manager

                  (309) 524-2355

                 dpreston@moline.il.us

   Chad Collins, Engineering Technician II 

   (309) 524-2359

   ccollins@moline.il.us