Pavement Striping, Location #2

Location 2 Road Diets

Moline will be implementing a “road diet” on 2 locations in 2020.  This will include re-striping pavement markings and replacing traffic signal detection in order to reduce the vehicular travel lanes to 2 or 3, and stripe a bike path on the pavement.

The second location will be 19th Avenue between 16th Street and the Rock Island border.

This project is being funded through local funds, including tax funds for electric and gas usage.

Timeline:  Spring / Summer 2020

Contractor:  T.B.D.

Capital Improvement Project:  T.B.D.

Funds:  

  • Tax on Electric & Gas Usage:   $215,000 (both locations)

Contact:  Darrel Preston, Construction Manager

                (309) 524-2355