This project will take place on 26th Avenue, between the 3800 block and 41st Street.

The project will include pavement replacement with a rock base and concrete pavement, shared-use path installation, driveway repairs, water main replacement including services, sanitary sewer lining, storm sewer repairs, and other associated work.

This project is being funded with REBUILD Illinois funds and local utility funds.

This project was chosen due to deteriorating pavement conditions, and the need to replace the water main.

Timeline:   Summer 2021

Contractor:  TBD

Capital Improvement Project:  MFT 279

Funds:

  • REBUILD Illinois:  $915,645
  • Water:  $436,365
  • Sanitary Sewer:  $362,500
  • Stormwater:  $31,500


Contact:  Darrel Preston, Construction Manager

(309) 524-2355