7th Street Asphalt Resurfacing

7th Street Asphalt Resurfacing, 12th – 16th Avenue

                Funding:            $432,000.00  Federal STBG (Surface Transportation Block Grant)

                                          $108,000.00  Local or MFT

                Timeline:            Anticipate Construction 2023

                Status:                Project Engineering has not begun.  Engineering design will be done in-house. 

                Description:        7th Street will be milled and resurfaced using asphalt.  The road and curbs will be repaired, driveways will be             repaired, sidewalks will be repaired, and handicap ramps will be installed.