River Drive Asphalt Overlay, 34th – 41st Street

River Drive Asphalt Overlay, 34th – 41st Street

                Funding:             $556,000.00  Federal STBG (Surface Transportation Block Grant)

                                           $139,000.00  Local or MFT

                Timeline:             Anticipate Construction 2022

                Status:                Phase I engineering is complete.  Phase II engineering is underway.  IDOT has asked that we do not construct                                             this project until 2022, due to construction of the I-74 bridge.  All engineering will be done in-house. 

                Description:        River Drive will be patched and overlaid with asphalt.  Driveways will be repaired, sidewalks will be repaired,             and handicap ramps will be installed.