2022 Patching Program

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8

This project will take place at various locations throughout the City.

This project will include pavement replacement with a rock base and concrete pavement, driveway repairs, sidewalk repairs, and other associated work.

This project is being funded with CIP, Water, and Sewer funds and was chosen due to its deteriorating pavement condition.

Timeline: Spring/Summer/Fall 2022

Contractor: Walter D. Laud, Inc.

Capital Improvement Project: 1380

Funds:

     • CIP Utility Tax: $975,000

     • Water: $250,000

     • WPC: $125,000

Contact: Darrel Preston, Construction Manager
(309) 524-2355
dpreston@moline.il.us

Joe Puck, Engineering Tech II
(309) 524-2361
jpuck@moline.il.us