The following routes are scheduled for concrete patching beginning April 16, weather permitting:
53rd St (J.D. Road to 47th Ave)
47th Ave (48th St. to 53rd St)
51st St (one-ways along drainage ditch)
44th Ave Ct (west of 51st St.)
46th Ave Ct (west of 51st St)
An asphalt overlay will follow. On-street parking will not be allowed during the concrete patching.